01/11

800 kWp grid-tied solar solution with seamless generator integration.

427 kWp grid-tied solar solution, seamlessly integrated with generator backup for enhanced reliability.

100 kWp hybrid solar solution, seamlessly integrated with a 200 kWh battery energy storage system (BESS).

600 kWp grid-tied solar solution, AC-coupled with a 1 MWh Huawei LUNA BESS and internal grid integration.

300 kWp grid-tied solar solution, seamlessly integrated with generator backup.

330 kWp grid-tied solar system integrated into the internal grid infrastructure.

300 kWp grid-tied solar solution integrated with a 1 MW standby generator.

150 kWp grid-tied solar solution.

280 kWp PV system with 300 kWp hybrid solar, coupled to a 400 kWh BESS and 3.3 kV internal grid integration.

100 kWp grid-tied solar solution, seamlessly integrated with the internal grid.

100 kWp grid-tied solar solution, seamlessly integrated with the internal grid.

HPS 100 ATS, coupled with 200/160 kWh Freedom Won battery energy storage system (BESS).

Replacement of line spacers on the Cahora-Bassa 500 kVA DC line, feeding from Mozambique to South Africa.

Live replacement of spaces on a DC line.

Cleaning of substations and insulators using sustainable materials.

1.25MVA Generator and integration installation.

500KVA Generator and installation.

Installation and commissioning of a generator.

160KWp DC solution coupled to a Hybrid VSD.

18KW DC systemcoupled to a 5000-liter Genn Energy Water solution.

3.3KWp Hybrid VSD system coupled to the grid.